Full Closures on Florida’s Turnpike at I-75 Interchange Scheduled to Begin on Monday, May 2

The Florida Department of Transportation (FDOT) is scheduled to close all lanes on Florida’s Turnpike at the I-75 interchange to pour the concrete deck for the new Express Lanes bridges over Florida’s Turnpike.  In order to perform this work safely, traffic will be detoured during the following dates and times:

All lanes of northbound Florida’s Turnpike at the I-75 interchange will be closed from 11 p.m.Monday, May 2 to 5 a.m. Tuesday, May 3. Motorists will be able to take the entrance ramp to northbound I-75 (Exit 39), exit at Miramar Parkway East (Exit 7A), continue east on Miramar Parkway to NW 57 Avenue / Red Road and turn south on NW 57 Avenue / Red Road to re-enter northbound Florida’s Turnpike. Please follow the posted detour.

All lanes of southbound Florida’s Turnpike at the I-75 interchange will be closed from 11 p.m.Thursday, May 5 to 5 a.m. Friday, May 6. Motorists will be able to take the exit ramp to NW 57th Avenue / Red Road (Exit 43), continue north on NW 57th Avenue / Red Road and turn west on Miramar Parkway to enter southbound I-75 and then take the entrance ramp to re-enter southbound Florida’s Turnpike (Exit 39). Please follow the posted detour.spa (1) spa (2)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s